Skip to main content

View Diary: Sunday Train: Putting Steel into the Amtrak Long Distance Backbone (87 comments)

Comment Preferences

  •  Yes, that is exactly what I am ... (7+ / 0-)

    ... BS on, the insane claim that there is a single long distance corridor "paid for" by Amtrak. Amtrak trackage fees are a miniscule portion of the revenues of a Class I railroad.

    Its a fine story to tell, but throwing around numbers does not imply that the numbrs add up. Amtrak routes are shoehorned onto the long distance routes that exist to haul long haul freight. If the Class I railroads had their way, Amtrak long distance trains would simply be cancelled.

    Support Lesbian Creative Works with Yuri anime and manga from ALC Publishing

    by BruceMcF on Mon Jun 11, 2012 at 08:30:24 AM PDT

    [ Parent ]

      •  No, Amtrak was not there ... (9+ / 0-)

        ... before the Great Northern was there. Amtrak was formed in 1971. The Great Northern was completed in 1893.


        Great Northern: Wikipedia

        The Great Northern Railway (reporting mark GN), running from Saint Paul, Minnesota, to Seattle, Washington — more than 1,700 miles (2,736 km) — was the creation of the 19th century railroad tycoon James J. Hill and was developed from the Saint Paul and Pacific Railroad. The Great Northern's route was the northernmost transcontinental railroad route in the United States. It was completed on January 6, 1893, at Scenic, Washington.

        The Great Northern was the only privately funded, and successfully built, transcontinental railroad in United States history. No federal land grants were used during its construction, unlike every other transcontinental railroad built. It was one of the few transcontinental railroads to avoid receivership following the Panic of 1893.

        The Great Northern Railway also fell victim to the deadliest avalanche in United States history, at the site of the now non-existent town of Wellington, Washington (later renamed, due to the disaster, to Tye, Washington).

        At the end of 1967 GN operated 8282 route-miles, not including class II subsidiaries MA&CR (3 miles) and PC (32 miles).

        Your argument is that spending public money on current bottlenecks to passenger service ~ in your particular example, the money is spent building a bypass for the Cascade Corridor to take to avoid the route used by heavy freight ~ coal, timber, wheat ~ taken to the port of Seattle ~ is a subsidy to the freight railroad.

        However: the heavy freight does not run on the bypass, the passenger trains do.

        And if the bypass is not built, the heavy freight continues to go through. The difference is that the passenger trains are stuck in a siding going nowhere, waiting for the freight train to pass.

        Now, not completing the bypass might slow down the heavy freight trains a bit, but the whole point of the heavy freight ghetto that railroads were forced into by the massive subsidies to truck freight since the 1930's is that lumps of coal do not much mind waiting an hour or two. They are, after all, lumps of coal, and if they are not waiting at that bottleneck, they will be waiting for the coal loader, or be dumped into a big pile of coal and wait there to be loaded into the bulk carriers.

        And that is not Amtrak spending. The Cascades Corridor is operated by Amtrak, but the service is subsidized and the trains are owned by Washington State and Oregon, and the funding for the bypass was an application by Washington State. Amtrak funding for trackwork goes to the Northeast Corridor, that is publicly owned, where freight railroads have to pay the public for the right to use the corridor, and mostly late at night because the corridor is being used during the train for various intercity and commuter passenger trains.

        Support Lesbian Creative Works with Yuri anime and manga from ALC Publishing

        by BruceMcF on Mon Jun 11, 2012 at 09:18:20 AM PDT

        [ Parent ]

        •  Do you know more about WA routes? (1+ / 0-)
          Recommended by:
          Creosote

          We feel we are getting the shaft as Obama's Clean Coal Export policy is implemented here in Bellingham WA.  We are looking at about 24-25 coal trains/day.  Please provide any insights on that.  You seem very knowledgeable.
          My first job was with the Great Northern as a extra board switchman.  We did have passenger service then, in 1964.

          •  You had passenger service in 1964 ... (4+ / 0-)

            ... because it was a regulatory requirement on the railways. When Amtrak was formed in 1971, those private railways that signed the agreement were relieved of those responsibilities in return for Amtrak having trackage rights on what had been their passenger routes. That's why Amtrak originally ran the Empire Builder.

            I do not know much off the top of my head about rail in East Washington along the Great Northern alignment, as the dominant flow of truck freight heads off in a more southwesterly direction, which is why the Steel Interstate from Seattle and Portland connects east/west via Salt Lake City in that Steel Interstate map.

            But I have a Sunday Train coming up on placing carbon taxes on coal exports to help find electrical transport, so I'll have it look at the Coal Export policy itself before then.

            Support Lesbian Creative Works with Yuri anime and manga from ALC Publishing

            by BruceMcF on Mon Jun 11, 2012 at 10:51:35 AM PDT

            [ Parent ]

Subscribe or Donate to support Daily Kos.

Click here for the mobile view of the site