Skip to main content

View Diary: Sunday Train: NEC High Speed Rail for Under $20b (31 comments)

Comment Preferences

  •  Yes, the notion of ... (1+ / 0-)
    Recommended by:
    RunawayRose

    ... shared HSR and 38ton axle load freight sharing track is not included here.

    A normal four track shared configuration is Express HSR on the express track, local all-stations passenger trains on the local track, and local express passenger trains on the local track making express passes on the express track. A SFFS configuration allows for some sharing of the local track by freight during off-peak periods without the freight running on the express track. For the NEC, with about 5% of its trains being freight, that seems quite workable.

    For an idea on greater utilization of the California corridor, see Sunday Train: Leveraging HSR for a Fresno Regional Rail Corridor

    Support Lesbian Creative Works with Yuri anime and manga from ALC Publishing

    by BruceMcF on Mon Jul 16, 2012 at 09:51:34 AM PDT

    [ Parent ]

Subscribe or Donate to support Daily Kos.

Click here for the mobile view of the site