  •  Everything is already in place (1+ / 0-)
    Recommended by:
    mystique mist

    They have the pipeline already connected to the transmission lines.  They have the storage tanks already installed,  They have a liquefaction train already built and operational.  All they need to do is install a couple of jumper pipes to allow ship loading and they're in business.  They could be loading a ship by Halloween this year.  

    •  I'm not certain they're that far along (2+ / 0-)
      Recommended by:
      LakeSuperior, LinSea

      jaguarpete, they may still need a FERC approval and a State air permit before they can build the liquefaction plant.

      “The answer must be, I think, that beauty and grace are performed whether or not we will or sense them. The least we can do is try to be there.” ― Annie Dillard, Pilgrim at Tinker Creek

      by 6412093 on Wed Sep 11, 2013 at 06:28:39 PM PDT