Does everyone remember seeing this image of the bend in the marine riser tubing taken after the sinking of the rig?

It shows the bent pipe above the BOP and marine riser package with no leak.
Last week they finally released video of the 2nd leak from this very section of pipe.
Clearly the leak from this point is getting much worse, and rapidly.
BP has claimed a notable yet insufficient success with their riser insertion tube which is 4" in diameter and inserted into the end of the open 21" riser casing on the see floor down stream of the 2nd leak near the BOP. They claim to be getting 5000 bbl per day of oil from that 4" tube.
Well the BOP has 2 separate 3" lines plumbed directly into the well that BP has been planning to use to pump heavy mud into to attempt a top kill. Here's a diagram of the top kill set up.
Here's another graphic:

Heck they have 2-3" lines plumbed directly into the well before it hits any water.
Why not use these two lines to produce oil/gas mix directly and thereby reduce the pressure and flow at the remaining two leaks?
if the 4" riser insertion tube can produce >= 5000 bbl/day then these 2-3" tubes should be able to produce at least 1.125x as much or another 5600 bbl/day. That's not even assuming you actively pump it to increase volumes.
Anyway this diary was just intended to provide another thought about another possibility for collecting more of the oil/gas at source and reducing the stress at the other leaks without needing to make the big gamble that attempting the top kill may make things a lot worse.
Comments are closed on this story.